Equipment

Infrastructure of Phase 1 & 2

Area: 42 ha

Berth length: 880 m

Depth in front of berth: -9.5 mCD

Maximum vessel size: 48,000 DWT, LOA 240m

Design capacity: 1,200,000 Teus/year

Shore cranes: 10QCs + 1 OOG mobile crane with lifting capacity of 125T

Yard cranes: 21 E-RTGs & 12 Reach Stackers

Reefer container support equipment: 1,200 power outlets

Infrastructure Phase 3

Construction start date: October 2024

Expected time of operation: October 2025

Area: 24 ha

Berth length: 660 m

Depth in front of berth: -9.5 mCD

Maximum vessel size: 48,000 DWT, LOA 240m

Design capacity: 1,000,000 Teus/year

Shore cranes: 03QCs + 02 Mobile cranes

Yard cranes: 10 E-RTGs & 06 Reach Stackers

Reefer container support equipment: 500 power outlets